05-09-2011, 01:42 AM
welp this weekend i finally loaded the car up on to a trailer and towed it out to my work will it will be untill finished..i was quoted 1 week to complete it so hopefully ill be driving it in 2 weeks (still need to find a good tuner) other then that well be good to go
2000 dark violet pearl zx3: eagle rods, je pistons, fidanza cam gears, arp studs, ford racing highlift valve springs, svt front/rear disc conversion, prothane total kit, fc 65mm throttle body Tial gt3071r, tial mvs wastegate, tial Q bov, top speed "street" manifold,down pipe and dump tube, greddy boost controller, siemens deka #61 injectorz, stage 4 bully clutch way to much more to list
Instagram @o_so_slo
Instagram @o_so_slo